0.0 0.0 0.0   1.0 0.1 1.5   5.0 9.9 -3.5  6.0 10.0 -4.0

following are for 5 kg propellant, 8, 3, 5 m ground sections
on near slope
0.0 0.0 0.0   1.0 0.1 1.5   5.0 7.9 -1.5  6.0 8.0 -2.5
0.0 0.0 0.0   1.0 0.1 1.5  2.5 2.0 3.0   5.0 7.9 -1.5  6.0 8.0 -2.5

on steep slope
0.0 0.0 0.0   1.0 0.1 1.5   5.0 9.9 -3.5  6.0 10.0 -4.0

on bottom
0.0 0.0 0.0   1.0 0.1 1.5   5.5 12.9 -4.5  6.5 13.0 -5.9




following are for 10 kg propellant, 20, 10, 10 m sections of ground

near bottom of upper slope
0.0 0.0 0.0   1.0 0.1 1.5  4.0 10.0 4.0   8.0 19.9 -5.0  9.0 20.0 -7.2

on lower (steep) slope
0.0 0.0 0.0   1.0 0.1 1.5  4.0 10.0 4.0   8.0 24.9 -10.0  9.0 25.0 -12.2

bottom
0.0 0.0 0.0   1.0 0.1 1.5   8.0 29.9 -11.0  9.0 30.0 -12.3

near bottom of far slope
0.0 0.0 0.0   1.0 0.1 1.5  4.0 10.0 4.0   9.0 39.9 -8.0  10.0 40.0 -10.5

on far side
0.0 0.0 0.0   1.0 0.1 1.5  10.0 59.9 1.5  11.0 60.0 0.0

something bad on the other side, turns around and tries to come back
0.0 0.0 0.0   1.0 0.1 1.5  9.0 59.9 4.5  10.0 60.0 3.0  12.0 55.0 4.2  19.0 10.0 4.5

